Location: Cumming, GA
Products: ALPOLIC (MCM)
General Contractor: CBI General Contractors
Architects: Pieper O’Brien Herr Architects
First Redeemer Church is expanding its adult education center and adding a preschool to its building. The 40,000-square-foot addition will feature 30 classrooms, a library and welcoming lobby with amenities. The adult education expansion aims to provide a welcoming space for adults to gather, learn and grow in their faith. The project will also create a new entry point for the church, providing a seamless transition for individuals entering the building. The new entryway will inspire and uplift, with an inviting lobby that sets the tone for a meaningful and enriching experience within the church. A dramatic entrance and fellowship area will serve as the focal point, bringing people together and fostering community and connection. For the project, MillerClapperton will be fabricating and installing 5,200 square feet of MCM for the Adult Education center and 270 square feet of MCM for the preschool.
|