Location: Atlanta, GA
Product: ALUCOBOND PLUS (MCM), PAC-CLAD (Single Skin)
General Contractor: JE Dunn Construction
Architect: Collins Cooper Carusi Architects
Phase II of renovations at Russ Chandler Stadium are underway at Georgia Tech to meet the school’s vision for its nationally renowned baseball program. The project includes the demolition of the existing one-story building and construction of a new, 25,379-square-foot, two-story structure. A concourse-level atrium will serve as an iconic point of entry to the stadium and on non-gamedays will convert into a teaching auditorium for Tech baseball and a venue for third-party rentals. Additional upgrades include a premium suite area with a terrace club view overlooking the field and the Atlanta skyline and a third-base concourse, which includes new restrooms, concession stand, and an outdoor plaza. MillerClapperton is fabricating and installing 1,370 square feet of Metal Composite Material and 3,050 square feet of Profiled Single Skin for the project.
|